Level 2 EV Charger (240V) in Jersey City — $2,526/yr to Run (19.5¢/kWh)
Your level 2 ev charger (240v) in Jersey City costs about $210/month at 19.5¢/kWh. See daily, monthly, and yearly costs, plus tips to cut your bill.
Jersey City, NJ Electricity Rate
19.5¢/kWh
Utility: PSE&G
+50% vs national avg
National avg: 13.0¢/kWh
Daily Cost
$8.42
43.2 kWh/day
Monthly Cost
$210.49
1080 kWh/mo
Annual Cost
$2,526
12,960 kWh/yr
Lifetime (15yr)
$37,889
energy only
Monthly Cost Breakdown in Jersey City
| Period | kWh | Jersey City Cost | National Avg | Difference |
|---|---|---|---|---|
| Daily | 43.2 | $8.42 | $5.62 | +$2.80 |
| Weekly | 302.4 | $58.94 | $39.31 | +$19.63 |
| Monthly | 1080.0 | $210.49 | $140.40 | +$70.09 |
| Quarterly | 3240.0 | $631.48 | $421.20 | +$210.28 |
| Annual | 12960.0 | $2525.90 | $1684.80 | +$841.10 |
Customize Your Level 2 EV Charger (240V) Cost
Adjust usage hours and electricity rate to calculate your exact cost in Jersey City.
Daily
$8.42
Monthly
$210.49
Annual
$2,526
15-Year
$37,889
Energy Saving Tips for Level 2 EV Charger (240V) in Jersey City
- ✓Jersey City electricity rates are 50% above the national average — energy efficiency matters more here.
- ✓A smart Level 2 EV Charger (240V) with scheduling optimization can save ~$505/year at Jersey City rates.
- ✓Charge during off-peak hours
- ✓Set charging schedules
- ✓Use solar for daytime charging
Highest-Cost Appliances in Jersey City, NJ
See which appliances cost the most to run at Jersey City's 19.5¢/kWh electricity rate.
Electric Furnace
HVAC · 10,000W
$1,754/yr
$146.17/mo
Electric Tankless Water Heater
Water Heating · 18,000W
$1,280/yr
$106.71/mo
EV Charger (Level 2)
Garage · 7,200W
$1,263/yr
$105.25/mo
Boiler (Electric)
HVAC · 6,000W
$1,052/yr
$87.70/mo
Electric Water Heater (Tank)
Water Heating · 4,500W
$960/yr
$80.03/mo
Water Heater (Tank Electric)
Water Heating · 4,500W
$960/yr
$80.03/mo
Heat Pump
HVAC · 2,400W
$748/yr
$62.37/mo
Hot Tub / Spa
Pool & Spa · 3,000W
$702/yr
$58.47/mo
Level 2 EV Charger (240V) Cost in Other New Jersey Cities
| City | Rate | Annual Cost | vs Jersey City |
|---|---|---|---|
| Jersey City (current) | 19.5¢ | $2,526 | — |
| Newark | 16.7¢ | $2,164 | $-362 |
| Paterson | 16.6¢ | $2,145 | $-381 |
| Elizabeth | 17.2¢ | $2,229 | $-297 |
| Edison | 17.0¢ | $2,207 | $-319 |
| Lakewood | 15.5¢ | $2,006 | $-520 |
| Woodbridge | 16.3¢ | $2,115 | $-411 |
| Toms River | 14.0¢ | $1,816 | $-710 |
| Trenton | 19.8¢ | $2,571 | +$45 |
Level 2 EV Charger (240V) Energy Cost FAQ — Jersey City, NJ
Understanding Level 2 EV Charger (240V) Energy Costs in Jersey City, NJ
Jersey City is a mid-sized New Jersey city where residential electricity rates from PSE&G are shaped by regional energy supply and local demand patterns. Running a high-draw appliance like the Level 2 EV Charger (240V) (7,200W) at Jersey City's rate of 19.5¢/kWh costs approximately $2,526 per year — $841 more than the national average of $1,685.
Electricity in Jersey City is significantly more expensive than the national average — 50% higher. For a Level 2 EV Charger (240V) used 6 hours per day, this rate premium adds up to $841 in extra annual costs. Energy-efficient models and usage habits have an outsized impact in high-rate markets like this.
With a cost of living index of 118, Jersey City is near the national median. The Level 2 EV Charger (240V)'s monthly cost of $210.49 represents a typical share of the average Jersey City electric bill of $135/month. While no ENERGY STAR version is available, a smart Level 2 EV Charger (240V) with automated scheduling can reduce consumption by 20%, saving $505/year.
Jersey City's moderate climate (avg 55.2°F) helps keep seasonal energy cost swings manageable for most appliances. A Level 2 EV Charger (240V) produces approximately 9.2 tons of CO2 annually at typical usage. Jersey City residents can reduce this footprint by optimizing usage patterns, or investing in solar — see our solar savings calculator for Jersey City.
Compare All Energy Costs in Jersey City
See energy costs for 178+ household appliances at Jersey City's local electricity rate.
Frequently Asked Questions
How much does it cost to run a Level 2 EV Charger (240V) in Jersey City, NJ?
At Jersey City's average electricity rate of 19.5¢/kWh, a Level 2 EV Charger (240V) costs approximately $2,526 per year to run. That's about $210.49 per month with typical usage of 6 hours per day.
What is the electricity rate in Jersey City, NJ?
The average residential electricity rate in Jersey City, NJ is 19.5¢/kWh, which is 50% above the national average of 13.0¢/kWh. The primary utility provider is PSE&G.
How much electricity does a Level 2 EV Charger (240V) use per year?
A Level 2 EV Charger (240V) uses approximately 7,200 watts and consumes about 12,960 kWh per year with typical usage of 6 hours/day for 300 days/year.
Is a Level 2 EV Charger (240V) expensive to run in Jersey City?
Compared to the national average cost of $1,685/year, running a Level 2 EV Charger (240V) in Jersey City costs $841 more per year due to higher local electricity rates.
How can I reduce my Level 2 EV Charger (240V) energy cost in Jersey City?
To reduce Level 2 EV Charger (240V) costs in Jersey City: Charge during off-peak hours. Set charging schedules. Consider using a smart plug to monitor and optimize usage. Also check with PSE&G for local energy efficiency rebates and programs.